Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Al Haj, R A and El-Sayegh, S M (2015) Time–Cost Optimization Model Considering Float-Consumption Impact. Journal of Construction Engineering and Management, 141(05).

Bijleveld, F R, Miller, S R and Dorée, A G (2015) Making Operational Strategies of Asphalt Teams Explicit to Reduce Process Variability. Journal of Construction Engineering and Management, 141(05).

Che Ibrahim, C K I, Costello, S B and Wilkinson, S (2015) A Fuzzy Approach to Developing Scales for Performance Levels of Alliance Team Integration Assessment. Journal of Construction Engineering and Management, 141(05).

Fitch, G J, Odeh, I and William Ibbs, C (2015) Economic Sustainability of DBO Water Based on Wastewater Projects in the U.S.: Three Case Studies. Journal of Construction Engineering and Management, 141(05).

Jablonowski, C J (2015) Quantitative Method to Model the Underreporting of Safety Incidents. Journal of Construction Engineering and Management, 141(05).

Jafarzadeh, R, Ingham, J M, Walsh, K Q, Hassani, N and Ghodrati Amiri, G R (2015) Using Statistical Regression Analysis to Establish Construction Cost Models for Seismic Retrofit of Confined Masonry Buildings. Journal of Construction Engineering and Management, 141(05).

Lin, S (2015) An Analysis for Construction Engineering Networks. Journal of Construction Engineering and Management, 141(05).

Rodríguez-Garzón, I, Lucas-Ruiz, V, Martínez-Fiestas, M and Delgado-Padial, A (2015) Association between Perceived Risk and Training in the Construction Industry. Journal of Construction Engineering and Management, 141(05).

Shahtaheri, M, Nasir, H and Haas, C T (2015) Setting Baseline Rates for On-Site Work Categories in the Construction Industry. Journal of Construction Engineering and Management, 141(05).

Zhang, P, Lingard, H, Blismas, N, Wakefield, R and Kleiner, B (2015) Work-Health and Safety-Risk Perceptions of Construction-Industry Stakeholders Using Photograph-Based Q Methodology. Journal of Construction Engineering and Management, 141(05).